​Services
-
​Base and wall kitchen units installation
-
Electrical work including (sockets, under counter lights, switches, ceiling lights, kickboard lights, SPUR switches, consumer units)
-
New suspended ceilings for halogen lights
-
Plumbing (cold and hot water, sink, waste disposal, etc)
-
Appliances installation (gas, electric hobs, ovens, dishwashers, washing machines, fridges, freezers, hood extractors)
-
Worktop installation (solid wood, laminated and marble, granite)
-
Tiling wall and floor (ceramic tiles, slates, mosaic, stone tiles)
KItchen
Extension
Base – Concrete
• Digging foundation
• Fill up foundation (sand and cement)
• Make the concrete floor
• Tile the floor
Walls
• Build the walls (cavity, insulate wall)
• Prepare space for windows and door
• Plastering and decorating
Flat roof
• Construct timber wood roof
• Lay roofing felt (underlay and finish felt)
• Install roof windows
• Fix rainwater and down pipe
-
Tiling wall and floor (ceramic tiles, slates, mosaic, stone tiles)
-
Plumbing (cold. hot water, towel rails, shower mixer’s equipment)
-
Under floor heating
-
Heated mirror
-
LED lights and halogen lights
-
Wet rooms
-
Bath suites replacement (shower enclosures, baths, basins, WC pans)
-
Bath and shower screens installation
-
Vanity and furniture installation
-
Time delay extractors
-
Assembly of independent scaffolding, front and back
-
Delivery of materials – structural steels, joisting timbers etc.
-
If a dormer conversion, the dormer will next be constructed, insulation installed
-
Completion of external works – roofing of dormer, lead work, fascias, soffits, guttering.
-
Exchange roof tiles
-
Internally, erecting studwork walls, forming bedrooms/ensuite/stairwell access. Insulating walls to required standard.
-
Fitting dormer windows/Velux windows.
-
Creating access to facilitate installation of new staircase and fitting new stairs.
-
Installing new cabling for lighting, sockets, Expelair, smoke alarms etc.
-
Plastering all new areas.
-
Build the bathroom walls, prepare plumbing and electric
-
Tile the wall and floor, fitting all bathroom suits.
-
Final inspection by Building Inspector who issues Completion Certificate (all works having complied with building and fire regulations).
-
Electrical work including (sockets, switches, ceiling lights, kickboard lights, SPUR switches)
-
Replace consumer unit (fuse board)
Suspended ceiling, partitions walls
-
Plumbing work install boiler and radiators (central heating)
-
Decorate and paint walls, ceiling
-
Decorate and paint the woodwork: (windows, door, skirting, picture rail, frames, etc).
-
Carpentry work (wardrobe, cupboards, shelves, etc).
-
Fix skirting, picture rail, dido, cornices, etc.
-
Fix the door, architraves, door frame, locks
-
Put up skim plaster, render
-
Install fire place
-
Put floor boards down(wooden floor, engineering floor, laminate)